Turn the Inverter rotary switch OFF.
Open the Maximizer Hub and disconnect the home runs for all strings at the Hub.
Wait 30 seconds.
Remove the black plastic cover on the Hub circuit board and check to see if there are LEDs lit on the board. If there are none, the board is deenergized and you can continue to the next step. If there are LEDs lit, the board is still energized and will need to be deenergized before continuing.
Reconnect the home runs for all strings to the Maximizer Hub.
Turn the Inverter rotary switch back On.
99.4 Power Cycle Lunar Maximizer Hub
O
Written by Ollie Wells