Skip to main content

Lunar System Installation Guide (LFP) — Overview

O
Written by Ollie Wells

Lunar System Installation Guide — Overview

lunarenergy.com | installerguides.lunarenergy.com

This documentation guides you through an end-to-end installation of the Lunar System (LFP). Visit the Lunar Installer Hub for downloadable manuals, training videos, and other installer resources.

Installation Steps

1. Roof Installation

Stringing requirements, Maximizer installation, and Maximizer Hub installation.

2. ESS Installation

ESS location requirements, mounting, conduit installation, inverter wiring, trunk harness installation, and closeout steps.

3. Bridge Installation

Bridge location requirements, mounting, conduit installation, and additional setup steps.

4. MSA Controller Installation

MSA Controller location requirements and MSA Controller installation.

5. Smart Breaker & CT Installation

Installing Eaton AbleEdge Smart Breakers and Rogowski Coil CTs.

6. Commissioning

Commission the Lunar System and onboard homeowners.

For the full step-by-step guide, visit: https://installerguides.lunarenergy.com/introduction

Did this answer your question?